Certified Network Infrastructure Design
- Design Principles
- Assess requirements
- Information gathering
- CDMQ
- Constraints
- Capacity planning
- Standards
- Standards organisations
- Cabling standards
- Installation standards
- Electrical standards
- Network and application standards
- Building Information Modelling (BIM)
- Spaces & Working Areas
- Building Entrance Facility (BEF)
- Main Equipment Room (MER)
- Building Distributor (BD)
- Floor Distributor (FD)
- Horizontal/work area distribution
- Site Survey
- Site survey process
- Greenfield and brownfield impacts
- Formulation of site survey report
- Cabling Sub-systems (ISP & OSP)
- OSP cabling
- Backbone cabling
- Horizontal cabling
- Network cabling
- Network Architecture
- Ethernet
- VOIP
- CCTV
- Wireless
- Access Control
- Environmental management
- Fire alarms
- Pathways & Containment
- Cable distribution systems
- Raised access floor
- Confined spaces
- OSP cable duct systems
- Fire Stopping
- Types & specifications
- Mechanical and non-mechanical
- Regulations and testing
- Bonding & Earthing
- Regulations
- Protective Earth (PE)
- Equipotential bonding
- Electrical and UPS
- Test & Commission Specification
- Commissioning process
- Certification test methods
- Testing standards
Certified Network Infrastructure Design Professional
- Understand the Design Process
- Roles of the design team
- Design stages
- Contracts
- Tools and traits for success
- Customer Requirements Assessment
- Conducting customer interviews
- Identfying key stakeholders
- Needs analysis
- Scope, plan and schedule
- ITT/RFQ Development
- RFP/RFQ objectives and structure
- Formulation of RFP/RFQ
- Scope review
- Bid submission
- Change management
- Bid Evaluations & Contract Negotiations
- Bid evaluation techniques
- Shortlist interviews
- Contract negotiations
- Contract award
- Project Execution
- Project delivery cycle
- Contractual and professional obligations
- Project scope and schedule
- Quality assurance/change management
- Installation and test sequences
- Communication plan
- Manage stakeholder expectations
- Administration, Documentation & Plans
- Identification systems
- Test results and reports
- As-built documentation
- Handover process
- Warranty compliance
- Commissioning & Closure
- Commission and test sequence
- Test results and documentation
- Snag/punch list process
- Customer handover
- Customer training
- Project closure process
Throughout this program students will work on an individual campus based case study.
This course does not have any sections.